NEC Experience: Courses Attended:
NEC3: Introduction to NEC3
NEC3: Introduction to the Engineering and Construction Contract (ECC)
NEC3: Producing Better Works Information
NEC3: Role of the ECC Supervisor
NEC3: ECC Programming Workshop    
NEC3: Managing Risk under the ECC
NEC3: Programme Provisions under NEC3 Contracts
NEC3: ECC Project Managers Workshop
NEC3: ECC Supervisor Accreditation

HS2 Stations Team- Client’s Project Engineer- I acted as a project engineer for HS2 Curzon Street Station and Birmingham New Street Station teams, where the project is using NEC 3 conditions of contract for Enabling works as well as for main works civils of the Birmingham Stations development.
I prepared Works information, Preconstruction Information Packs, Work Package Instructions and client requirements for Birmingham Stations.

Network Rail- Reading Area Redevelopment and Greater West Project- I was the Senior Project Engineer for Thames Valley Area projects where all the engineering approvals/ acceptance are under my remit. I reviewed Non-conformities and approved where necessary. I acted as a technical lead for conditions of contracts and represented client (Network Rail) in the meetings where strategic decisions made about the projects.

BAM Nuttall Ltd.-

Acton Dive Under Project- Senior Design Engineer NEC 3 Option C
£22 Million Responsible for successful completion of the construction phase design works and obtained the required approvals for designs.

Victoria Station Project – Senior Design Engineer – NEC 3
£360 Million Responsible for designing and management of many complex and varied temporary works required to ensure the smooth construction of above stations. Large scale propping, tower crane foundations, sheet piling next to the rail way. Working closely with Network Rail/ London Underground and Cross Rail teams to develop solutions for smooth construction of works.

Farringdon Station Project– Senior Design Engineer
Cross Rail - BFK £750 million Responsible for designing of all temporary work requirements for the project e.g. Tower crane foundation & casting anchors, Analyzing and designing 1835 built brick arch 9m high retaining wall which was supporting Farringdon Road. Responsible for representing BAM in Cross rail design development meetings.

Olympic Park project + Legacy Work – NEC 3 Senior Design Engineer
650 Million Responsible for organizing team of designers to ensure efficiency in delivering temporary works designs for both the enabling work package at the south end of the park and for the roads and bridges contract. There are several permanent work designs which include submission of AIP’s and collaborating with ODA e.g. greenway extension.
NEC Projects: High Speed 2    
NEC 3    
Project Engineer    
55Bn    
11/2016 - 06/2017

Network Rail – Greater West Electrification Project & Reading Station Area Redevelopment Project
NEC & NR Standard suits of contracts    
Senior Project Engineer    
900M    
06/2015 - 11/2016
Olympic Park Project + Legacy Works
NEC 3    
Senior Design Engineer    
650 M    
10/2007 - 06/2015

Farringdon Station Project    
NEC 3    
Senior Design Engineer    
750 M    
12/2012 - 06/2015

Victoria Station Upgrade    
NEC 3    
Senior Design Engineer    
360M    
10/2012 - 06/2015

Action Dive under Project    
NEC 3    
Senior Design Engineer    
22M    
09/2012 - 06/2015

East London Line Project    
NEC 2 – Option C
Section Engineer    
60M    
01/2006    04/2007

Wembley Park Capacity Enhancement
Project    NEC 2 – Option A    
Section Engineer    
9M    
09/2004 - 01/2006

Member of the ICE Register of:
NEC3 ECC Supervisor

Profession(s):
Civil Engineer  |  Architect  |  Structural Engineer  |  Consultant

Industry Type:
Public  |  Private

Industry Sectors:
Building  |  Highways and Transport  |  Civil Engineering