Siu Lun Cheung, BSc     

Name: Siu Lun Cheung, BSc
Affiliations: (NECReg)
E-mail: slcheung@buildking.hk
Current Position: Chief Operating Officer, Build King Civil Engineering Limited, Build King Construction Limited, Build King (Zens) Engineering Limited
NEC Experience: Duration: 27/02/2018 – 02/03/2018
NEC Project Manager Accreditation

Duration: 07/2016 – Present
Position: Director
NE/2015/02 Tseung Kwan O – Lam Tin Tunnel, Road P2 and Associated Works (Contract Sum: HK$1,776M)
(NEC3 ECC Option C Project)
Major works consisted of:
This contract mainly comprises the reclamation of approximately 3 hectares at Junk Bay, the construction of the dual two-lane Road P2 of approximately 800 m long with approximately 200 m of the depressed carriageway covered by landscape deck, and the implementation of the associated building, civil, structural, marine, electrical and mechanical, landscaping and environmental protection and mitigation works.

Responsible for the overall management and execution of the project, monitoring the performance of the project at operation level and ensuring successful completion of such with specified quality standard within contract duration and achieving target profit.

Duration: 11/2012 – 10/2016
Position: Project Director
Contract No. HY/2011/13 Improvement to Pok Oi Interchange (Contract Sum: $170M)
(NEC2 ECC Option C Project)
The works to be provided under this contract are to implement improvement measures to Pok Oi Interchange and the associated site formation works, which are briefly described, without limitation, as follows:
-    Construction of a single lane flyover of about 150 m long adjacent to the northbound carriageway of the elevated Yuen Long Highway (YLH) over Pok Oi Roundabout (POR);
-    Construction of a slip road of about 500 m long connecting the northbound carriageway of the ground level section of YLH south of POR to the proposed flyover (namely Slip Road A);
-    Construction of a slip road of about 130 m long connecting the proposed flyover to the northbound carriageway of YLH north of POR (namely Slip Road B);
-    Construction of a slip road of about 400 m long connecting the southbound carriageway of the elevated YLH to the ground level section of YLH south of POR (namely Slip Road C);
-    Construction of a segregated left turn lane of about 110 m long near the northern approach road (southbound) of POR with the associated pedestrian subway extension;
-    Local widening of about 140 m long of the existing southbound carriageway of YLH north of POR from three-lane to four-lane;
-    Local widening of about 400 m long of the existing northbound carriageway of YLH north of POR;
-    Re-Provisioning of existing noise barriers of about 30 m long 3 m high along the northern approach road (southbound) of POR (namely Noise Barrier A);
-    Installation of vertical noise barriers of about 200 m long 2.5 m high along the southern approach road (northbound) of POR (namely Noise Barrier B); and ssociated road, slope, drainage, traffic aids, road lighting, utilities, landscaping and electrical and mechanical works.

Responsible for the overall management and execution of the project, monitoring the performance of the project at operation level and ensuring successful
NEC Projects: NE/2015/02 Tseung Kwan O – Lam Tin Tunnel, Road P2 and Associated Works    NEC3 ECC Option C    
Director    
HK$1,776M    
07/2016-09/2020

Contract No. HY/2011/13 Improvement to Pok Oi Interchange    
NEC2 ECC Option C    
Project Director    
HK$170M    
11/2012-10/2016

Member of the ICE Register of:
NEC3 ECC Project Manager

Industry Type:
Private

Industry Sectors:
Building  |  Civil Engineering